How to Use the "Parking Lot" Technique in Daily Scrums

ScrumPoi · · 11 min read

How to Use the "Parking Lot" Technique in Daily Scrums

Your Daily Scrum Is Too Long Because You Talk About the Wrong Things

If your “15-minute” Daily Scrum regularly drifts to 25–30 minutes, the problem isn’t your team’s discipline. The problem is your agenda.

Most teams secretly use the Daily Scrum as a:

  • Status report to the Scrum Master
  • Design discussion
  • Impromptu refinement session
  • Therapy circle for blockers

Then they wonder why people tune out, cameras go off, and developers start dreading it.

The “parking lot” technique is the simplest way to fix this—and most teams either don’t use it, or use it badly.

Let’s fix that.


What Is the Parking Lot Technique (Really)?

The parking lot is a visible place to “park” topics that are:

  • Important
  • Off-topic for the current meeting
  • Worth discussing with a smaller group, later

In a Daily Scrum, it’s your guardrail against derailment.

The Real Goal of the Daily Scrum

Quick reminder: the Daily Scrum is not for:

  • Status updates to the Scrum Master
  • Solving problems in real time
  • Debating architecture

The Daily Scrum is for:

  • Inspecting progress toward the Sprint Goal
  • Adapting the plan for the next 24 hours
  • Identifying blockers and coordination needs

That’s it. If a conversation doesn’t help with those three things, it’s a candidate for the parking lot.

What the Parking Lot Is (and Isn’t)

It is:

  • A short list of topics to discuss after the Daily Scrum
  • A way to protect focus and timebox
  • A commitment: “We will talk about this, just not now”

It is not:

  • A graveyard for uncomfortable topics
  • A way to shut people down
  • A sticky note that never gets revisited

If your team doesn’t trust that parking lot items will actually be handled, the technique will fail. The follow-up is the real magic.


Why You Need a Parking Lot in Your Daily Scrum

Let’s be blunt: most teams waste at least 30–60 minutes per week in bloated Daily Scrums.

The Cost of Not Using a Parking Lot

On a team of 8 people:

  • A 15-minute Daily Scrum costs: 2 hours of team time per day
  • If it drifts to 25 minutes, that’s: ~3.3 hours per day
  • That’s 6.5 extra hours per week—almost a full workday—for no extra value

Multiply that by:

  • 10 sprints per quarter
  • 4 quarters per year

You’re burning weeks of engineering time just because you don’t have a way to say, “Let’s park that.”

Typical Pain Points the Parking Lot Solves

You’ve probably seen these:

  • Architecture rabbit holes
    One question about “Should we use Kafka here?” turns into a 12-minute debate.

  • Dependency therapy sessions
    Two people argue about an API contract while six others stare at their screens.

  • Scope creep mid-Scrum
    Product Owner: “While we’re here, can we also talk about adding a small enhancement…?”

  • Context-switch chaos
    People jump between stories, bugs, tech debt, and roadmap ideas with no structure.

The parking lot is your “Not now, but definitely later” mechanism. Used well, it keeps the Daily Scrum sharp and fast without killing important conversations.


How to Use a Parking Lot in Daily Scrums (Step-by-Step)

Here’s a concrete, battle-tested way to implement it.

1. Make the Parking Lot Visible

Use something everyone can see in real time:

  • A column on your digital board: “Parking Lot”
  • A shared doc or Miro/Mural board
  • A simple text list in your team’s Slack channel

The key: it must be visible during the Daily Scrum.

Example:

  • Create a Jira board column called “Parking Lot – Today”
  • Or a Confluence page: “Daily Scrum Parking Lot – Week of April 15”

2. Define Clear Parking Lot Rules

Be explicit with the team. For example:

“If a topic takes more than 30 seconds to explain and doesn’t directly change today’s plan, we’ll park it.”

Good candidates:

  • Deep-dive on a blocker
  • Design decisions
  • Cross-team dependencies
  • Scope or priority questions
  • Process improvements

Bad candidates:

  • “I don’t want to talk about this.” (That’s avoidance, not parking)
  • “This is urgent but I don’t want to solve it now.” (Urgent issues may need to preempt)

3. Nominate a Parking Lot Scribe

Don’t make the Scrum Master do everything.

  • Rotate the role weekly
  • Scribe’s job:
    • Add items to the parking lot
    • Capture who raised it
    • Capture who needs to attend follow-up
    • Keep it short: 1–2 lines per item

Example format:

  • “API error handling for checkout – Alice, Bob, PO”
  • “Clarify acceptance criteria for story ABC-123 – Dev team + PO”
  • “Decide logging strategy for new service – Backend devs”

4. Use a Simple Parking Phrase

Teach the team a standard phrase so it doesn’t feel rude:

  • “Let’s park this and come back right after the Daily Scrum.”
  • “This sounds like a great parking lot topic—mind if we add it?”
  • “This is important, but not for this meeting. I’ll put it in the parking lot.”

The phrase matters. It signals:

  • Respect: “This is important”
  • Boundaries: “But not now”

5. Timebox and Enforce

The Scrum Master (or whoever facilitates) should:

  • Start a 15-minute timer for the Daily Scrum
  • At minute 13–14, say:
    • “We have 1–2 minutes left. Any quick updates that change today’s plan?”
  • If someone starts a deep dive:
    • “This is going deep—parking lot?”

You’re not being rigid; you’re protecting everyone’s time.

6. Immediately Decide What Happens Next

The biggest failure mode: parking items and never revisiting them.

At the end of the Daily Scrum:

  • Look at the parking lot list
  • For each item, decide:
    • Who needs to be there
    • When you’ll discuss it
    • How long you’ll timebox it

Example:

  • “API error handling – Alice, Bob, PO – 20 min right after this call”
  • “Logging strategy – backend devs – add to today’s tech huddle, 15 min”

If an item doesn’t deserve a follow-up:

  • Be honest and say so
  • Or convert it into a backlog item or retro topic

Real-World Example: Fixing a Dysfunctional Daily Scrum

Team: 9-person dev team, distributed, working on a B2B SaaS product.

Before parking lot:

  • Daily “standup” averaged 28 minutes
  • Two senior devs dominated 70% of the talking time
  • Three people barely spoke at all
  • Developers complained: “This meeting kills my morning”

What they changed:

  1. Introduced a visible parking lot column on their board
  2. Set a rule: anything needing more than 60 seconds of discussion goes to the parking lot
  3. Scrum Master enforced a 15-minute hard stop
  4. They scheduled a daily 20-minute “follow-up huddle” right after the Daily Scrum for parking lot items (optional attendance)

After 3 sprints:

  • Average Daily Scrum: 13–16 minutes
  • Follow-up huddle used ~60% of days, with 3–5 people
  • Team self-reported:
    • 40% reduction in perceived meeting fatigue
    • More focused discussions with the right people
  • One dev’s feedback:

    “I finally feel like I can plan my morning. If it’s not relevant, I’m not stuck listening to it.”


Common Mistakes with the Parking Lot (What Not to Do)

The parking lot is simple, but easy to misuse. Avoid these traps.

Mistake 1: Turning It into a Topic Graveyard

If items go into the parking lot and never come out:

  • People stop suggesting topics
  • Important issues get buried
  • The technique loses credibility

Fix:

  • Review the parking lot at the end of every Daily Scrum
  • Clear it weekly: everything must be:
    • Discussed
    • Turned into a backlog item
    • Explicitly dropped (with a reason)

Mistake 2: Parking Critical Issues That Need Immediate Action

Not everything can wait.

Bad example:

  • “Production is down, but let’s park that and stay focused on updates.”

If something is:

  • Time-sensitive
  • High-impact
  • Blocking many people

Then:

  • Pause the Daily Scrum
  • Decide how to handle it:
    • “We’ll break from the Daily Scrum and switch to incident mode.”
    • Or: “Alice and Bob will handle this now; others can drop.”

The parking lot is for important-but-not-urgent, not emergencies.

Mistake 3: Using It to Shut People Up

If the Scrum Master or lead uses “parking lot” as a weapon to silence discussion:

  • Psychological safety drops
  • People stop raising risks or concerns
  • Real problems surface too late

Watch for these anti-patterns:

  • Always parking the same person’s topics
  • Never actually scheduling follow-ups
  • Dismissing topics with “Let’s park that” and moving on

The fix is simple: respect every parked topic by:

  • Capturing it clearly
  • Following up or explicitly closing it

Mistake 4: Parking Everything That Feels Hard

Some things should be discussed briefly in the Daily Scrum:

  • “This blocker means we probably can’t hit the Sprint Goal.”
  • “We discovered a dependency that changes today’s plan.”

If a 2–3 minute conversation:

  • Changes priorities for today
  • Impacts the Sprint Goal

It belongs in the Daily Scrum, not the parking lot.

Mistake 5: No Owner, No Outcome

A parked item without:

  • A clear owner
  • A timebox
  • An outcome

…is just noise.

When you park something, always define:

  • Who owns the follow-up
  • When it will happen
  • What “done” looks like (decision, spike, ticket, etc.)

Practical Tips to Make the Parking Lot Actually Work

Here’s how to go beyond theory and make this stick.

Tip 1: Start with a Parking Lot Experiment

Don’t announce a big process change. Try:

“For the next 2 weeks, we’ll experiment with a parking lot in our Daily Scrum and see if it shortens the meeting and improves focus.”

Measure:

  • Average Daily Scrum duration
  • Number of parking lot items per day
  • How often follow-ups happen

Discuss in your next retrospective:

  • What’s working
  • What feels awkward
  • What to tweak

Tip 2: Use a Simple Template

Create a quick template wherever you track it:

Columns:

  • Topic
  • Raised by
  • Participants
  • When
  • Outcome

Example entry:

  • Topic: “Clarify acceptance criteria for ABC-123”
  • Raised by: Sam
  • Participants: Dev team + PO
  • When: Today 10:30–10:45
  • Outcome: Updated Jira ticket with new AC

Tip 3: Combine with Strong Facilitation

The parking lot is a tool; facilitation is the skill.

Facilitator phrases:

  • “Is this changing what we’ll do today? If not, let’s park it.”
  • “Sounds like a deep topic—who needs to be in that follow-up?”
  • “We’re at 14 minutes. Any last updates that affect today’s plan?”

Rotate facilitation so everyone practices this muscle.

Tip 4: Use Tools That Make Follow-Ups Easy

You don’t need heavy tooling, but you do need low-friction follow-ups:

  • Create quick calendar invites right after the Daily Scrum
  • Turn some topics into backlog items on your board
  • Capture others as retro topics or spikes

For planning and retrospectives themselves, tools like ScrumPoi can help keep those sessions focused too—especially with features like anonymous voting and no-signup sessions for quick, ad-hoc discussions when a parking lot item turns into a deeper conversation.

Tip 5: Track One Simple Metric

To see if the parking lot helps, track:

  • Average Daily Scrum length per sprint

If it’s not trending toward 15 minutes (or less) without losing alignment, something’s off:

  • You’re not parking enough
  • You’re parking the wrong things
  • Or you’re not following up, so people resist parking

Conclusion: Protect the Daily Scrum, Don’t Inflate It

The Daily Scrum is supposed to be:

  • Short
  • Tactical
  • Energizing

If it’s long, meandering, or draining, the solution is not “try harder.” The solution is structure—and the parking lot is one of the simplest structures you can add.

Use it to:

  • Keep the Daily Scrum laser-focused on today’s plan and the Sprint Goal
  • Move deep dives and debates to smaller, targeted follow-ups
  • Respect everyone’s time and everyone’s ideas

If your team leaves the Daily Scrum thinking, “That was fast and useful,” your parking lot is doing its job.

Keep reading

More on the topics this article touches.